Welland History .ca

Historic EVENTS in and around Welland

ELECTRIC RAILWAY MATTERS

NIAGARA FALLS TOWN

[Welland Tribune, 13 July 1900]

Sunshine or rain, wind, heat or cold, have no effect toward completion of the electric street railway. Half a dozen gangs are now working on different parts of the line. The poles are nearly all up down town, and the careful and efficient manner in which they have been put in is a credit to those who had the work in charge and to the Niagara, St. Catharines and Toronto Company. On part of Erie avenue the poles have had to be set in the pavement, which has been done very neatly and carefully. All surplus and waste material is carefully gathered up and removed and the workmen leave the streets in as good or better shape than they found them. The poles are now being planted along the line to the South. On Victoria avenue the space on the outside of the track has been neatly levelled and graded, and presents a better appearance than it ever did before. All street crossing have been put in good shape, and all decayed planks and timber have been replaced by new lumber.

Connection has been made between the power house at Stamford and the N.F.P. and R. Ry power house at the Falls, and the power from the latter is being used to run machinery in the former until its own engines can be got into running order. F.W. Carter has charge of the electrical department at this end of the line.

The first electric car over the line from St. Catharines to Niagara Falls was run on Wednesday morning. It brought a load of workmen for the Falls View line, and made very good time. A regular service will be put on very soon.

Add A Comment

You must be logged in to post a comment.